PCB design survey finds conflict between thermal, SI/EMC

Posted: 15 Aug 2006 ?? ?Print Version ?Bookmark and Share

Keywords:Electromagnetic compatibility? signal integrity? Flomerics? XX? XX?

Signal integrity (SI) and electromagnetic compatibility (EMC) requirements for PCB design are frequently conflict, according to the majority of the 91 respondents in a survey conducted by Flomerics Inc.

The report further survey reveals that 59 percent of those who participated in the survey agreed that thermal and EMC requirements are usually in conflict in PCB design, with only 23 percent indicating that they disagreed. Meanwhile, 60 percent agreed that thermal and SI requirements are usually in conflict in PCB design, with 23 percent indicating that they disagreed.

However, the virtual prototype provider said the survey paints a positive picture with regard to communication and collaboration between electronic and mechanical design engineers at most companies, with 64 percent of respondents describing communication as "good" or "very good;" 31 percent saying it "needs to improve;" and just 4 percent describing it as "very poor."

Fifty-six percent of respondents stated that "better software interfaces between electronic and mechanical software would greatly improve collaboration between electronic design engineers and mechanical design engineers," while 28 percent said "software is not the issuegood management, human interaction, etc. are more important."

The company said respondents were also asked to identify the percentage of new designs that overran time and cost budgets, and the most common causes of such overruns, with most respondents (50 percent) saying that 10-30 percent of new PCB designs overran time and cost budgets, while 28 percent said less than 10 percent, 18 percent said 30-50 percent and 4 percent said more than 50 percent.

The most common causes of time and budget overruns were: design requirement changes (59 percent); circuit design (39 percent); thermal problems (34 percent); EMC problems (32 percent); signal integrity problems (30 percent); physical layout problems (22 percent); and routing problems (19 percent).

The average design cycle time for a new PCB design from concept to final testing and manufacturing signoff was specified at six to 12 weeks by 50 percent of respondents, with 29 percent saying more than 12 weeks and 21 percent saying less than six weeks.

When asked what generates the greatest pressure on the PCB design function, 54 percent said "functionality and performance," while 30 percent said "time to market" and 14 percent said "cost." Regarding the design flow, 62 percent of respondents indicated that there are "lots of interaction" between design stages such as concept design, detailed design, design verification, etc., while 38 percent said that design flow is performed in sequential stages with "little interaction between stages."

Sixty-one percent of respondents said that "a person or group with clear responsibility for thermal aspects of PCB design exists," while 39 percent said there was "no such person or group."

The survey results are based on 91 responses. The industry sectors most represented among survey respondents were telecommunications (23 percent), power electronics (18 percent), aerospace and defense electronics (17 percent), and automotive and transportation electronics (11 percent).

- Dylan McGrath
EE Times




Article Comments - PCB design survey finds conflict bet...
Comments:??
*? You can enter [0] more charecters.
*Verify code:
?
?
Webinars

Seminars

Visit Asia Webinars to learn about the latest in technology and get practical design tips.

?
?
Back to Top